Workshop progress

May 5, 2023 by
Workshop progress
Sébastien Bühl
| No comments yet

Preparatory work in the workshop plays a crucial role in the realization of this project at Lumumba Ville. The various components are prepared, assembled and tested before being installed on site.

Adjusting and welding the structures that will house the mini-grid equipment. 

Adjustment and welding work is nearing completion. This phase marks the final stage before final painting. Highly skilled welders work with precision to assemble and weld the various parts of the structure, ensuring that all connections are strong and durable. 

After many hours of hard work, we are delighted to announce that the first assembly of the project is about to be finalized. Dieumerci Muyayalo, our workshop manager, has estimated a further 5 days to complete this crucial phase. This includes not only finalizing the assembly, but also carrying out the necessary tests to guarantee the quality and conformity of the system.


In parallel with progress on the first assembly, work on the LVBT for the 2nd site is also very active. At present, work has reached the stage of checking and recovering the necessary materials. This stage ensures that all materials are present and in good condition prior to final installation. Once this verification is complete, the team will be able to proceed with the installation of the TGBT on site, in compliance with the specific standards and requirements of the project. 

Workshop work is a crucial stage in the realization of our project in partnership with ANSER. We look forward to seeing these advances materialize in the field, and will continue to provide you with regular updates on progress.